Testing Sync in Fronthaul

The high accuracy required for fronthaul networks poses challenges for testing. For example, the maximum time error produced by a class D T-BC must be less than 10ns. This means the test equipment must be significantly more accurate still.

A second issue is that accuracy requirements on each device are approaching the limits of the measurement interfaces themselves. For Class A and B devices, the standard time measurement interface is the 50Ω 1pps interface. This is specified in G.703 as having a rise time of less than 5ns. By the time the pulse has reached the end of the cable, this can have increased significantly to 10ns or more. This skew degrades the accuracy of the interface such that it is not possible to determine the original position of the signal with any great precision.

Using PTP over optical Ethernet is more accurate, in part because it is an optical signal so not subject to the same electrical skews, but also because it is bidirectional, allowing the fibre delay to be automatically calculated. Therefore PTP over optical Ethernet is a more accurate measurement interface than the 50Ω 1pps, provided any asymmetry in the fibre delays is controlled and compensated if necessary.

The first is to test each device individually, to ensure it meets the required specification. This requires a very high accuracy tester to verify the performance of Class C and Class D T-BCs, as shown below.

However, in the case of fronthaul devices, that may not be enough. Some operators are proposing to use FlexE for the node-to-node connections, with standard Ethernet just for the connections to the radio elements (the “client drops”). FlexE is a variant of Ethernet optimised to support the network slicing that is required in 5G networks. The support for SyncE and PTP over FlexE is still an ongoing discussion, so the best way to test this at present is to test two devices back-to-back:

The second part is to test the network itself. In a laboratory environment, this can be done in a similar way to testing FlexE T-BCs above. The tester can be used as the PTP Grandmaster, or alternatively (as shown below), it can be synchronized to the PRTC/T-GM device. The measurement points are then either on the last T-BC (using a PTP/SyncE connection), or if available, a 1pps output from the T-TSC. This test point is almost certainly embedded in the basestation or radio element itself, so may not be available in all equipment. The use of a 1pps signal to measure on here is acceptable because the network limit (around ±130ns) is much larger than the limit on an individual T-BC.

It’s clear that the synchronization requirements of 5G’s New Radio are significantly harder to meet than previous mobile radio generations. This will require a new generation of equipment to meet the requirements, and a new generation of test equipment to verify that the requirements have been met.

Tim Frost
Strategic Technology Manager, Calnex Solutions.

Recent Blogs

Related Blogs

banana skin

Will SD-WAN really be the savior?

Mar 13, 2019
The only way to prove it is to get validation on how it will perform against your needs…
1386 Read more
Four Boardroom Members

How to Optimise Your IT Network and Spend

Feb 06, 2019
Network emulation can be a key tool to overcome barriers in getting the most out of your…
2318 Read more

Responding to IT Network Issues

Jan 22, 2019
If simple remedial scripts are not enough to fix an IT network issue, a more…
3584 Read more

Archived Blogs

834 More

Timing not Telecoms

Nov 08, 2016
565 More

5G Coming Soon

Aug 22, 2016
571 More

What is 1588 PTP?

Aug 04, 2016
687 More

5G on the Horizon

Aug 01, 2016
564 More
607 More

What is a PTP Clock?

Apr 09, 2016
712 More

What is Time Error?

Oct 21, 2015
579 More

LTE-A & VoLTE Rollout

Sep 22, 2015
563 More

LTE Picks Up Speed

Aug 22, 2015
548 More

What is the Time?

Aug 22, 2015
556 More

Mobile and Sync

Aug 22, 2015
524 More

What is SyncE?

Aug 22, 2015
1017 More
613 More

Microwave Update

Aug 22, 2015
600 More

Unravelling Standards

Aug 22, 2015
580 More

Partial Progress?

Aug 22, 2015
554 More

Interpreting ITU

Aug 22, 2015
536 More

Confusion Rules!

Aug 22, 2015
560 More

Basestations Need Sync

Aug 22, 2015
573 More

ITSF 2015 Edinburgh

Aug 22, 2015
537 More

India to Follow China?

Aug 07, 2015
551 More
HOW CAN CALNEX HELP YOU FURTHER?

Click your area of interest below for more tutorials and real-world case studies.